Physical water treatment equipment
We will summarize the selection concept based on the main body, winding, installation location, and piping diameter of the frequency conversion induction method.
Solutions
SERVICE AREAS
We provide information from equipment selection to post-installation confirmation for scale, algae slime, corrosion, and chemical management burdens faced by factories and equipment management departments.
We will summarize the selection concept based on the main body, winding, installation location, and piping diameter of the frequency conversion induction method.
We will provide an easy-to-understand explanation in Japanese of the information contained in the materials regarding anti-scaling, descaling, control of bacteria and algae, and anti-corrosion.
We will post case studies from food, steel, chemicals, oil fields, automobiles, etc., along with points to check before and after implementation.
TARGET SYSTEMS
The documents list refrigerators, air compressors, heat exchangers, condensers, oil field furnaces, steelmaking equipment, generators, air conditioners, heating, boilers, etc. as target systems.

IMPLEMENTATION PROCESS
The installation location is generally the main supply water pipe after the cooling tower circulation pump, and the recommended winding pipe length is approximately 20 times the pipe diameter or more. In actual consideration, it is necessary to confirm the site conditions.
